Prime Minister Narendra Modi and Nepal Prime Minister Balendra Shah on Sunday laid the foundation stone for the Rs 5,792.36 crore Lower Arun hydroelectric project. Located on the Arun river, this plant aims to generate 2,901 million units of electricity annually. Nepal will get 21% of this power for free.
NEW DELHI: Prime Minister Narendra Modi and Nepal Prime Minister Balendra Shah on Sunday jointly laid the foundation stone of SJVN's 669 MW Lower Arun hydroelectric project in Nepal, which is estimated to cost Rs 5,792.36 crore.
The project, being developed by SJVN's wholly owned subsidiary SJVN Lower Arun Power Development Company, is located on the Arun river in Sankhuwasabha and Bhojpur districts of eastern Nepal. It is expected to generate around 2,901 million units of electricity annually, with a tentative tariff of Rs 4.99 per unit, SJVN said in a statement.
The project is designed to operate in tandem with SJVN's 900 MW Arun-3 hydroelectric project upstream, using water discharged from the latter for power generation. "This arrangement will ensure optimum utilisation of available water resources, enabling additional renewable energy generation without constructing a separate storage reservoir," the company said.
The plant will have four generating units of 167.25 MW each, a 17.4 km headrace tunnel and a surface powerhouse. It is being developed on a build, own, operate and transfer basis and is targeted for commissioning in 2030-31.
Under the project development agreement, Nepal will get 21% of the electricity generated free of cost.